Tilled the green, bowl connector, red, and all of blue with the PB100. Unfortunately the tracksetters on this cat were damaged in the collapse and will be heading into surgery as soon as possible. There are no tracks set at this time. We will continue tilling trails and will set track as often as possible using our Skandic and TiddTech.

| Pas de damage aujourd'hui | Distance | Ouvert | Dernier damage |
|---|
| 4-6 Jours | Distance | Ouvert | Dernier damage | |
|---|---|---|---|---|
Stadium Connector | 0.26km | |||
Green Loop | 0.68km | |||
Powerlines Connector | 0.61km | |||
Blue Loop | 3.12km | |||
Red Loop | 1.46km |
| 7-10 Jours | Distance | Ouvert | Dernier damage | |
|---|---|---|---|---|
Purple Loop | 0.91km | |||
1st Cutoff | 0.48km | |||
2nd Cutoff | 0.3km |